This project consists of four major scopes:

i. Scope A – The scope involves modification by installing permanent piping and pump facilities for ISO tanker loading and permanent new Heavy Oil Tank (estimated 1200m3 net capacity). Scope splitted into two scopes:
Scope A-1 – Basic Engineering Design of Pump System
Scope A-2 – Basic Engineering Design of New Tank System
ii. Scope B – Installation of permanent N2 purging facilities for light separation system
iii. Scope C – To install permanent ethylene and propylene pressurizing facilities
iv. Scope D – Installation of new pressure transmitter linked to DCS for monitoring

Client: PCDSB