Skip to Content

Category Archives: Refinery

Embracing Digital Transformation

MECIP_DIGATEX Partneship

MECIP and DIGATEX were very pleased to be in Kuala Lumpur working with Petronas on applying Artificial Intelligence to deliver significant improvements in RAPID operational readiness.  Petronas are at the forefront of embracing digital transformation to provide immediate business value and we look forward to continued collaboration in this exciting field.

0 Continue Reading →

Hookup of CTP Aeromobil Treatment System

Scope: Basic and Detail Engineering Design

Client: PETRONAS Penapisan Melaka Sdn. Bhd.

Description:

  • Waste water treatment system upgrading study and design
  • Integration of integrated effluent treatment system with Aeromobil System – temporary floatater
  • Fluid transfer engineering
  • First mobile waste water treatment system installed in Asia
0 Continue Reading →

Lead Lag Configuration at PSR-1 CRU

Scope: Basic Engineering Design (BED)

Client: PETRONAS Penapisan Melaka Sdn. Bhd.

Description:

  • Process and Instrumentation control – Lead Lag
  • Cost Estimation – EPCC
0 Continue Reading →

Sodium Hypochlorite Injection Facility

Scope: Basic and Detail Engineering Design

Client: PETRONAS Chemicals Ethylene Sdn. Bhd.

Description:

-Injection Facility

-Process and Instrumentation Control design

-Process Safety / Safeguarding study

-Mechanical Tank design

0 Continue Reading →

Installation of Top Unheading Device (TUD) on Delayed Coker Unit (DCU)

Scope: Detail Engineering Design (DED)

Client: PETRONAS Penapisan Melaka Sdn. Bhd.

Description:

  • Process and Safety Study – RV, TRV, etc.
  • Complex piping routing, stress analysis
  • Structural Analysis
  • Nozzle stess analysis
  • Instrumentation and Process Control
0 Continue Reading →

Detail Feasibility Study for Effluent Treatment System

Client : PETRONAS Penapisan (Melaka) Sdn Bhd

Objective :

To develop a holistic feasibility study and recommend improvement projects with optimum cost to debottleneck the design as well as the operational constraints at effluent discharged sources, collection facilities and ETS unit operations.

To recommend measures for improvement that ensuring reliable performance of ETS facilities and compliance to new industrialeffluent discharge requirement (IER 2009).

0 Continue Reading →

KR1 Debottlenecking Feasibility Study & BED

Client : Petronas Penapisan (Terengganu) Sdn. Bhd
0 Continue Reading →

Incinerator Compliance & Reliability Improvement

Client : PETRONAS Chemicals Olefins Sdn Bhd

 

0 Continue Reading →

ăn dặm kiểu NhậtResponsive WordPress Themenhà cấp 4 nông thônthời trang trẻ emgiày cao gótshop giày nữdownload wordpress pluginsmẫu biệt thự đẹpepichouseáo sơ mi nữhouse beautiful