Basic Engineering Design of PETRONAS Gas Berhad Effluent Treatment System

Client : PETRONAS Gas Berhad

Objective :

SCOPE A : INSTALL NEW FLOW METERS AT CRT FEED AND DAF RECIRCULATION LINE

SCOPE B : INSTALL NEW pH AND DISSOLVED OXYGEN (DO) ANALYZER FOR AERATION BASIN

SCOPE C: INSTALL AIR SPARGER AT SLUDGE SUMP T-1004

SCOPE D: REROUTE NEUTRALIZED REGEN WASTEWATER TO HOLDING POND